FOSHAN, China — PeakVision is proud to announce the successful completion of a major industrial cooling project at a leading textile manufacturing facility in Binh Duong Province, Vietnam. The project involved the design, supply, and installation of a comprehensive evaporative cooling system covering the factory's entire 10,000 m² production hall.
The Challenge
The customer, a well-established textile manufacturer supplying major global apparel brands, approached PengjingTech with a pressing problem: their weaving and spinning hall had become unbearably hot during the summer months, with temperatures regularly exceeding 38°C.
The issues were multifaceted:
The Solution
After conducting a detailed site assessment and airflow modeling, the PengjingTech engineering team recommended a comprehensive evaporative cooling system:
Measured Results
Within the first week of operation, the customer reported dramatic improvements:
|
Metric |
Before |
After |
Improvement |
|
Average floor temperature |
38.5°C |
28.2°C |
-10.3°C |
|
Worker productivity |
Baseline |
+18% |
+18% |
|
Employee turnover (monthly) |
4.2% |
1.8% |
-57% |
|
Quality defect rate |
2.8% |
1.9% |
-32% |
|
Monthly cooling cost |
N/A |
$1,250 |
Minimal investment |
Customer Feedback
"Before this project, our workers were struggling through 38-degree heat every summer. Now the whole production hall stays comfortable even on the hottest days. The investment paid for itself within the first year through improved productivity and reduced turnover."
— Factory Director, Binh Duong Textile Manufacturer
Expanding Partnership
Following the success of this project, the customer has already placed a follow-up order to extend the cooling system to their second factory building, also in Binh Duong province. That project, covering an additional 8,000 m², is scheduled for completion in Q1 2027.
FOSHAN, China — PeakVision is proud to announce the successful completion of a major industrial cooling project at a leading textile manufacturing facility in Binh Duong Province, Vietnam. The project involved the design, supply, and installation of a comprehensive evaporative cooling system covering the factory's entire 10,000 m² production hall.
The Challenge
The customer, a well-established textile manufacturer supplying major global apparel brands, approached PengjingTech with a pressing problem: their weaving and spinning hall had become unbearably hot during the summer months, with temperatures regularly exceeding 38°C.
The issues were multifaceted:
The Solution
After conducting a detailed site assessment and airflow modeling, the PengjingTech engineering team recommended a comprehensive evaporative cooling system:
Measured Results
Within the first week of operation, the customer reported dramatic improvements:
|
Metric |
Before |
After |
Improvement |
|
Average floor temperature |
38.5°C |
28.2°C |
-10.3°C |
|
Worker productivity |
Baseline |
+18% |
+18% |
|
Employee turnover (monthly) |
4.2% |
1.8% |
-57% |
|
Quality defect rate |
2.8% |
1.9% |
-32% |
|
Monthly cooling cost |
N/A |
$1,250 |
Minimal investment |
Customer Feedback
"Before this project, our workers were struggling through 38-degree heat every summer. Now the whole production hall stays comfortable even on the hottest days. The investment paid for itself within the first year through improved productivity and reduced turnover."
— Factory Director, Binh Duong Textile Manufacturer
Expanding Partnership
Following the success of this project, the customer has already placed a follow-up order to extend the cooling system to their second factory building, also in Binh Duong province. That project, covering an additional 8,000 m², is scheduled for completion in Q1 2027.